Status Report, September 2012

Where things are :

In the past people have asked me to clarify the locations of things so I hope that this illustration helps to show where things are on the second floor. This is also an opportunity to give a status update.

Layout of the new upstairs

  • The deck and the terrace are both going to have tile on them. The deck area tile is done but the railing around the deck needs to be finished. I posted a process picture of the tile deck on facebook  here.  The basic railing design I posted earlier on this blog here.  I am still tweaking the design a bit so it is slightly different than the illustration. There are different designs for varying transparency in different places. At the end of the deck  2 of the railing sections will be glass.
  • The arbor I made already and is ready for install when I am sure that it won’t get in the way of any other installation.
  • The stairs are in process. The metal frame is in place but I still need to level everything and make the final connections to the building. There will be plenty of work to do here. The engineer specified a beam under the floor where the stairs hit the lower level. The treds are wood and need to be cut and attached, then metal verticals are attached to each tred and those are topped with a solid wood handrail.
  • The bathroom and closet walls in the new bedroom have not been built yet. The entire bathroom has not been started yet. I want to wait until I get the new bathtub before I commit to exact placement of the bathroom wall.

I hope this helps to show where things are in relation to each other.

About dirk

I'm living in a very small house and documenting my processes and discoveries in the hope that it may be useful to someone else.
This entry was posted in Details and tagged , , , , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *